Manifest / 02Go
Starlink Group 15-14
Falcon 9 Block 5
ProviderSpaceX
PadSpace Launch Complex 4E
DateJul 14, 2026
Local time01:16 AM UTC
T-:::
02
15
22
43

This mission is complete.
The GEOS 1 (Geodetic Earth Orbiting Satellite) spacecraft was a gravity-gradient-stabilized, solar-cell powered unit designed exclusively for geodetic studies.
Ground vector
Space Launch Complex 17A
Cape Canaveral SFS, FL, USA
Launch commit criteria
Tracking no weather issues at this time.
06:38 PM UTC - 06:38 PM UTC
Schedule updated