Miura 5 — mission imagery
Back to launches
TBD

2 x Tritó

Miura 5Payload Aerospace S.L.Diamant Launch Area
Friday, December 31, 2027 · 12:00 AM UTCAdd to Calendar

NextMission AnnouncedT-720:00:00

Time to launch

537
DAYS
:
14
HRS
:
00
MIN
:
21
SEC
Launch Window Confidence
46% — Uncertain

Vehicle

MIURA 5 is a 2 stage launch vehicle powered by liquid oxygen and kerosene. The vehicle is designed, integrated and operated by PLD Space, and its 1st stage is designed to be eventually...

Height35.8 m
LEO Payload900 kg
Launches3
Successes1

Provider

Payload Aerospace S.L.

Profile →

ESP • Founded 2011

Payload Aerospace S.L. is a Spanish company developing two partially-reusable launch vehicles called Miura 1 and Miura 5.

Mission Brief

First two high-capacity 5G D2D (Direct-to-Device) Tritó satellites for Spanish satellite operator Sateliot.

Payload2 x Tritó
OrbitLow Earth Orbit
CustomerPayload Aerospace S.L.
Stages3
PadDiamant Launch Area, Guiana Space Centre, French Guiana

Mission Timeline

0 / 140%
Up next · Pre-launch

Mission Announced

Official mission announcement and payload assignment

T-720:00:00
12:00 AM UTC
  • Mission AnnouncedT-720:00:00
  • Vehicle RolloutT-48:00:00
  • Wet Dress RehearsalT-24:00:00
  • Launch Day PrepT-06:00:00

Ground vector

Launch site

Site locked

Diamant Launch Area

Guiana Space Centre, French Guiana

Global range
SITE LOCK
Latitude
5.222°N
Longitude
52.776°W

Range Weather

Launch commit criteria

Clear
Watch
TrackingNo active constraints
Weather Rules

Tracking no weather issues at this time.

Primary concern
No weather issues
Rule count
0
Temperature
Not reported
Surface wind
Not reported
Window

12:00 AM UTC - 12:00 AM UTC

Schedule History

No delays or schedule changes recorded.