Falcon 9 Full Thrust — mission imagery
Back to launches
Failure

Amos 6 (Failure before launch)

Falcon 9 Full ThrustSpaceXSpace Launch Complex 40
Saturday, September 3, 2016 · 07:00 AM UTCAdd to Calendar

This mission is complete.

Vehicle

Falcon 9 Full Thrust

Profile →

Falcon 9 is a two-stage rocket designed and manufactured by SpaceX for the reliable and safe transport of satellites and the Dragon spacecraft into orbit. The Block 5 variant is the fif...

Height70 m
LEO Payload22,800 kg
Launches832
Successes687

Provider

USA • Founded 2002

Space Exploration Technologies Corp., known as SpaceX, is an American aerospace manufacturer and space transport services company headquartered in Hawthorne, California. It was founded in 2002 by entrepreneur E...

Mission Brief

**FAILURE: Rocket and payload lost during anomaly originating around the upper stage oxygen tank during propellant load few minutes before static fire on Sept 1, 1307UTC.** Built to replace the existing AMOS-2 satellite, AMOS-6 will be positioned in a geostationary orbit at 4 degrees west. The 5500kg craft will contain 43 Ku/Ka-band transponders and 2 S-band transponders to provide communications coverage for Africa, Europe and the Middle East. The 2 solar arrays on the craft will provide 9kW of power for the satellite’s 16 year expected lifetime.

PayloadAmos 6 (Failure before launch)
OrbitGeostationary Transfer Orbit
CustomerSpaceX
Stages2
PadSpace Launch Complex 40, Cape Canaveral SFS, FL, USA
WeatherNo formal weather concerns published, temperature not reported

Mission Timeline

20 / 20100%

Ground vector

Launch site

Site locked

Space Launch Complex 40

Cape Canaveral SFS, FL, USA

Global range
SITE LOCK
Latitude
28.562°N
Longitude
80.577°W

Range Weather

Launch commit criteria

0%
GO
ConstrainedNo active constraints
Weather Rules

No formal weather rule concerns published.

Primary concern
None published
Rule count
0
Temperature
Not reported
Surface wind
Not reported
Window

07:00 AM UTC - 09:00 AM UTC

Schedule History

No delays or schedule changes recorded.