Manifest / 01
Nova-C IM-3
NextGo for Prop LoadT-35:00
Time to launch
Mission Brief
This is the third mission to the Moon for Intuitive Machines with its Nova-C lunar lander. It is to deliver 130 kg of payloads to the lunar surface. This mission also includes a rideshare possibility due to available excess capacity on the launch vehicle.
Mission Timeline
0 / 200%Go for Prop Load
Launch director gives the go to begin fueling
- Go for Prop LoadT-35:0011:25 PM UTC
- RP-1 Loading BeginsT-35:0011:25 PM UTC
- Stage 1 LOX Loading BeginsT-35:0011:25 PM UTC
Ground vector
Launch site
Unknown Pad
Cape Canaveral SFS, FL, USA
- Latitude
- 28.458°N
- Longitude
- 80.528°W
Range Weather
Launch commit criteria
Tracking no weather issues at this time.
- Primary concern
- No weather issues
- Rule count
- 0
- Temperature
- Not reported
- Surface wind
- Not reported
12:00 AM UTC - 12:00 AM UTC
Provider
SpaceX
Profile →USA • Founded 2002
Space Exploration Technologies Corp., known as SpaceX, is an American aerospace manufacturer and space transport services company headquartered in Hawthorne, California. It was founded in 2002 by entrepreneur E...
Schedule History
Only meaningful launch-time and status changes are shown.
Schedule updated
