Atlas V 401 — mission imagery
Back to launches
Success

JPSS 2 (Joint Polar Satellite System spacecraft No. 2) & LOFTID

Atlas V 401United Launch AllianceSpace Launch Complex 3E
Thursday, November 10, 2022 · 09:49 AM UTCAdd to Calendar

This mission is complete.

Vehicle

Atlas V 401

Profile →

Atlas V is an expendable launch system in the Atlas rocket family. It was formerly operated by Lockheed Martin and is now operated by United Launch Alliance (ULA), a joint venture with...

Height59.7 m
LEO Payload18,850 kg
Launches211
Successes173

Provider

United Launch Alliance

Profile →

USA • Founded 2006

United Launch Alliance (ULA) is a joint venture of Lockheed Martin Space Systems and Boeing Defense, Space & Security. ULA was formed in December 2006 by combining the teams at these companies which provide spa...

Mission Brief

JPSS is a collaborative program between NOAA and NASA. JPSS-2 is one of five satellites that will comprise the JPSS constellation. These spacecraft gather global measurements of atmospheric, terrestrial and oceanic conditions, including sea and land surface temperatures, vegetation, clouds, rainfall, snow and ice cover, fire locations and smoke plumes, atmospheric temperature, water vapor and ozone. LOFTID is a tech demo for the inflatable heatshield technology. It will attempt to survive a reentry from orbit after JPSS 2 is separated. This test will validate the technology for various applications, such as landing large payloads on Mars and engine reuse on ULA’s Vulcan rocket.

PayloadJPSS 2 (Joint Polar Satellite System spacecraft No. 2) & LOFTID
OrbitSun-Synchronous Orbit
CustomerNASA Large Strategic Science Missions
Stages2
PadSpace Launch Complex 3E, Vandenberg SFB, CA, USA
WeatherNo formal weather concerns published, N/A

Mission Timeline

11 / 11100%
Site lock

Launch Site

Space Launch Complex 3E, Vandenberg SFB, CA, USA

LAUNCH SITE
34.640°N, 120.590°W

Weather

Condition
No formal weather concerns published
Temperature
N/A
Wind
N/A
GO Probability
95%

Schedule History

No delays or schedule changes recorded.